{"id":13395,"date":"2019-09-30T11:39:43","date_gmt":"2019-09-30T06:39:43","guid":{"rendered":"https:\/\/blog.graana.com\/?p=13395"},"modified":"2019-09-30T17:40:10","modified_gmt":"2019-09-30T12:40:10","slug":"1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace","status":"publish","type":"post","link":"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/","title":{"rendered":"$1.9 billion hydropower project under CPEC to pick up the pace"},"content":{"rendered":"<p>ISLAMABAD: Pakistan-China to accelerate one of the largest projects under the CPEC initiative, according to media reports.<\/p>\n<p>The run-of-river project, Suki Kinari Hydropower Project, is being established alongside the Kunhar River in Khyber Pakhtunkhwa.<\/p>\n<p>One of the largest private sector power development projects, Suki Kinari Hydropower is part of CPEC \u201cEarly Harvest\u201d projects. The $1.9 billion project is being built on Build-Operate-Transfer (BOT) model. The BOT model entails that the China Gezhouba Group Corporation (CGGC) will transfer the project to the KP government after operating it for 30 years.<\/p>\n<p>Kunhar River\u2019s power generation potential was first explored in the 1960s but wasn\u2019t materialised. The agreement of construction of a dam on the river was signed by the KP government with SK Hydro Power Ltd and the Industrial and Commercial Bank of China in 2016 that actualised the project.<\/p>\n<p>It has been reported that around 41.85% of construction work has been completed.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ISLAMABAD: Pakistan-China to accelerate one of the largest projects under the CPEC initiative, according to &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"\" href=\"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/\"> <span class=\"screen-reader-text\">$1.9 billion hydropower project under CPEC to pick up the pace<\/span>  <\/a><\/p>\n","protected":false},"author":20,"featured_media":13399,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","footnotes":""},"categories":[44,61,22,46,53,62],"tags":[828,722,870,896,897],"class_list":["post-13395","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","category-cpec-updates","category-everyday-news","category-graana-news","category-infrastructure","category-mega-projects","tag-china","tag-cpec","tag-development","tag-hydropower","tag-suki-kinari","is_not_urdu"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v21.4 (Yoast SEO v25.2) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>$1.9 billion hydropower project under CPEC to pick up the pace | Graana.com<\/title>\n<meta name=\"description\" content=\"Pakistan-China to accelerate one of the largest projects under the CPEC initiative, according to media reports.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"$1.9 billion hydropower project under CPEC to pick up the pace\" \/>\n<meta property=\"og:description\" content=\"Pakistan-China to accelerate one of the largest projects under the CPEC initiative, according to media reports.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/\" \/>\n<meta property=\"og:site_name\" content=\"Graana.com\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/GraanaCom\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-09-30T06:39:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-09-30T12:40:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.graana.com\/blog\/wp-content\/uploads\/2019\/09\/Cpec-1.9.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"960\" \/>\n\t<meta property=\"og:image:height\" content=\"640\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Maham Tahir\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"$1.9 billion hydropower project under CPEC to pick up the pace\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Maham Tahir\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/\"},\"author\":{\"name\":\"Maham Tahir\",\"@id\":\"https:\/\/www.graana.com\/blog\/#\/schema\/person\/3fa4e943f425ded187cef3f4db25d349\"},\"headline\":\"$1.9 billion hydropower project under CPEC to pick up the pace\",\"datePublished\":\"2019-09-30T06:39:43+00:00\",\"dateModified\":\"2019-09-30T12:40:10+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/\"},\"wordCount\":159,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.graana.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/wpasset.graana.com\/blog\/wp-content\/uploads\/2019\/09\/Cpec-1.9.jpg\",\"keywords\":[\"China\",\"CPEC\",\"Development\",\"hydropower\",\"Suki Kinari\"],\"articleSection\":[\"Construction\",\"CPEC updates\",\"Everyday News\",\"Graana News\",\"Infrastructure\",\"Mega Projects\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/#respond\"]}],\"copyrightYear\":\"2019\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.graana.com\/blog\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/\",\"url\":\"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/\",\"name\":\"$1.9 billion hydropower project under CPEC to pick up the pace | Graana.com\",\"isPartOf\":{\"@id\":\"https:\/\/www.graana.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/wpasset.graana.com\/blog\/wp-content\/uploads\/2019\/09\/Cpec-1.9.jpg\",\"datePublished\":\"2019-09-30T06:39:43+00:00\",\"dateModified\":\"2019-09-30T12:40:10+00:00\",\"description\":\"Pakistan-China to accelerate one of the largest projects under the CPEC initiative, according to media reports.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/#primaryimage\",\"url\":\"https:\/\/wpasset.graana.com\/blog\/wp-content\/uploads\/2019\/09\/Cpec-1.9.jpg\",\"contentUrl\":\"https:\/\/wpasset.graana.com\/blog\/wp-content\/uploads\/2019\/09\/Cpec-1.9.jpg\",\"width\":941,\"height\":627,\"caption\":\"$1.9 billion hydropower project under CPEC to pick up the pace\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.graana.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction\",\"item\":\"https:\/\/www.graana.com\/blog\/construction\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"$1.9 billion hydropower project under CPEC to pick up the pace\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.graana.com\/blog\/#website\",\"url\":\"https:\/\/www.graana.com\/blog\/\",\"name\":\"Graana.com\",\"description\":\"Pakistan&#039;s 1st Online Real Estate Marketplace\",\"publisher\":{\"@id\":\"https:\/\/www.graana.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.graana.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.graana.com\/blog\/#organization\",\"name\":\"Graana.com\",\"url\":\"https:\/\/www.graana.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.graana.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/wpassets.graana.com\/blog\/wp-content\/uploads\/2022\/03\/logo.svg\",\"contentUrl\":\"https:\/\/wpassets.graana.com\/blog\/wp-content\/uploads\/2022\/03\/logo.svg\",\"width\":1,\"height\":1,\"caption\":\"Graana.com\"},\"image\":{\"@id\":\"https:\/\/www.graana.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/GraanaCom\/\",\"https:\/\/www.pinterest.com\/graanacom\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.graana.com\/blog\/#\/schema\/person\/3fa4e943f425ded187cef3f4db25d349\",\"name\":\"Maham Tahir\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.graana.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b6845e63cb4018c261a46d3e7381612fafcece9e05b59df62f59f522890c8568?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b6845e63cb4018c261a46d3e7381612fafcece9e05b59df62f59f522890c8568?s=96&d=mm&r=g\",\"caption\":\"Maham Tahir\"},\"url\":\"https:\/\/www.graana.com\/blog\/author\/newsdesk\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"$1.9 billion hydropower project under CPEC to pick up the pace | Graana.com","description":"Pakistan-China to accelerate one of the largest projects under the CPEC initiative, according to media reports.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/","og_locale":"en_US","og_type":"article","og_title":"$1.9 billion hydropower project under CPEC to pick up the pace","og_description":"Pakistan-China to accelerate one of the largest projects under the CPEC initiative, according to media reports.","og_url":"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/","og_site_name":"Graana.com","article_publisher":"https:\/\/www.facebook.com\/GraanaCom\/","article_published_time":"2019-09-30T06:39:43+00:00","article_modified_time":"2019-09-30T12:40:10+00:00","og_image":[{"width":960,"height":640,"url":"https:\/\/www.graana.com\/blog\/wp-content\/uploads\/2019\/09\/Cpec-1.9.jpg","type":"image\/jpeg"}],"author":"Maham Tahir","twitter_card":"summary_large_image","twitter_title":"$1.9 billion hydropower project under CPEC to pick up the pace","twitter_misc":{"Written by":"Maham Tahir","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/#article","isPartOf":{"@id":"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/"},"author":{"name":"Maham Tahir","@id":"https:\/\/www.graana.com\/blog\/#\/schema\/person\/3fa4e943f425ded187cef3f4db25d349"},"headline":"$1.9 billion hydropower project under CPEC to pick up the pace","datePublished":"2019-09-30T06:39:43+00:00","dateModified":"2019-09-30T12:40:10+00:00","mainEntityOfPage":{"@id":"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/"},"wordCount":159,"commentCount":0,"publisher":{"@id":"https:\/\/www.graana.com\/blog\/#organization"},"image":{"@id":"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/#primaryimage"},"thumbnailUrl":"https:\/\/wpasset.graana.com\/blog\/wp-content\/uploads\/2019\/09\/Cpec-1.9.jpg","keywords":["China","CPEC","Development","hydropower","Suki Kinari"],"articleSection":["Construction","CPEC updates","Everyday News","Graana News","Infrastructure","Mega Projects"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/#respond"]}],"copyrightYear":"2019","copyrightHolder":{"@id":"https:\/\/www.graana.com\/blog\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/","url":"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/","name":"$1.9 billion hydropower project under CPEC to pick up the pace | Graana.com","isPartOf":{"@id":"https:\/\/www.graana.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/#primaryimage"},"image":{"@id":"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/#primaryimage"},"thumbnailUrl":"https:\/\/wpasset.graana.com\/blog\/wp-content\/uploads\/2019\/09\/Cpec-1.9.jpg","datePublished":"2019-09-30T06:39:43+00:00","dateModified":"2019-09-30T12:40:10+00:00","description":"Pakistan-China to accelerate one of the largest projects under the CPEC initiative, according to media reports.","breadcrumb":{"@id":"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/#primaryimage","url":"https:\/\/wpasset.graana.com\/blog\/wp-content\/uploads\/2019\/09\/Cpec-1.9.jpg","contentUrl":"https:\/\/wpasset.graana.com\/blog\/wp-content\/uploads\/2019\/09\/Cpec-1.9.jpg","width":941,"height":627,"caption":"$1.9 billion hydropower project under CPEC to pick up the pace"},{"@type":"BreadcrumbList","@id":"https:\/\/www.graana.com\/blog\/1-9-billion-hydropower-project-under-cpec-to-pick-up-the-pace\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.graana.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Construction","item":"https:\/\/www.graana.com\/blog\/construction\/"},{"@type":"ListItem","position":3,"name":"$1.9 billion hydropower project under CPEC to pick up the pace"}]},{"@type":"WebSite","@id":"https:\/\/www.graana.com\/blog\/#website","url":"https:\/\/www.graana.com\/blog\/","name":"Graana.com","description":"Pakistan&#039;s 1st Online Real Estate Marketplace","publisher":{"@id":"https:\/\/www.graana.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.graana.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.graana.com\/blog\/#organization","name":"Graana.com","url":"https:\/\/www.graana.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.graana.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/wpassets.graana.com\/blog\/wp-content\/uploads\/2022\/03\/logo.svg","contentUrl":"https:\/\/wpassets.graana.com\/blog\/wp-content\/uploads\/2022\/03\/logo.svg","width":1,"height":1,"caption":"Graana.com"},"image":{"@id":"https:\/\/www.graana.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/GraanaCom\/","https:\/\/www.pinterest.com\/graanacom"]},{"@type":"Person","@id":"https:\/\/www.graana.com\/blog\/#\/schema\/person\/3fa4e943f425ded187cef3f4db25d349","name":"Maham Tahir","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.graana.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b6845e63cb4018c261a46d3e7381612fafcece9e05b59df62f59f522890c8568?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b6845e63cb4018c261a46d3e7381612fafcece9e05b59df62f59f522890c8568?s=96&d=mm&r=g","caption":"Maham Tahir"},"url":"https:\/\/www.graana.com\/blog\/author\/newsdesk\/"}]}},"is_urdu":false,"_links":{"self":[{"href":"https:\/\/www.graana.com\/blog\/wp-json\/wp\/v2\/posts\/13395","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.graana.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.graana.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.graana.com\/blog\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/www.graana.com\/blog\/wp-json\/wp\/v2\/comments?post=13395"}],"version-history":[{"count":0,"href":"https:\/\/www.graana.com\/blog\/wp-json\/wp\/v2\/posts\/13395\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.graana.com\/blog\/wp-json\/wp\/v2\/media\/13399"}],"wp:attachment":[{"href":"https:\/\/www.graana.com\/blog\/wp-json\/wp\/v2\/media?parent=13395"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.graana.com\/blog\/wp-json\/wp\/v2\/categories?post=13395"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.graana.com\/blog\/wp-json\/wp\/v2\/tags?post=13395"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}