{"id":18396,"date":"2020-05-03T20:20:25","date_gmt":"2020-05-03T15:20:25","guid":{"rendered":"https:\/\/blog.graana.com\/?p=18396"},"modified":"2022-07-06T12:19:27","modified_gmt":"2022-07-06T07:19:27","slug":"cda-to-resume-construction-of-signal-free-controlled-access-corridor","status":"publish","type":"post","link":"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/","title":{"rendered":"CDA to resume construction of Signal Free Controlled Access Corridor"},"content":{"rendered":"<p style=\"margin: 12.0pt 0in 12.0pt 0in;\"><span style=\"color: black;\">ISLAMABAD: After announcing to resume the construction work on the Signal Free Controlled Access Corridor soon, the Capital Development Authority (CDA) has invited bids for the development of the Korang Bridge.<\/span><\/p>\n<p style=\"margin: 12.0pt 0in 12.0pt 0in;\"><span style=\"white-space: pre-wrap;\"><span style=\"color: black;\">The project approved under the Public Sector Development Programme (PSDP) is calculated to cost over Rs.741 million.<\/span><\/span><\/p>\n<p style=\"margin: 12.0pt 0in 12.0pt 0in;\"><span style=\"white-space: pre-wrap;\"><span style=\"color: black;\">In a meeting of the Development Working Party (DWP), the committee deliberated on taking a phase-wise approach to address the existing issues pertaining to traffic.<\/span><\/span><\/p>\n<p style=\"margin: 12.0pt 0in 12.0pt 0in;\"><span style=\"white-space: pre-wrap;\"><span style=\"color: black;\">The meeting gave the approval of phase-I, under which Korang Bridge and PWD underpass will be constructed.<\/span><\/span><\/p>\n<p style=\"margin: 12.0pt 0in 12.0pt 0in;\"><span style=\"white-space: pre-wrap;\"><span style=\"color: black;\">After approval, a transparent bidding process has been initiated by the CDA Management for the construction of the bridge. The project will be carried out under Single Stage Two Envelope procedure, seeking bids from firms registered with Pakistan Engineering Council having valid registration Certificate.<\/span><\/span><\/p>\n<p style=\"margin: 12.0pt 0in 12.0pt 0in;\"><span style=\"white-space: pre-wrap;\"><span style=\"color: black;\">The authority has also issued a notification to invite bids for the construction of PWD underpass at earliest.<\/span><\/span><\/p>\n<p>For news and blogs, visit <a href=\"https:\/\/www.graana.com\/blog\/\">Graana.com.\u00a0<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>ISLAMABAD: After announcing to resume the construction work on the Signal Free Controlled Access Corridor &hellip;<\/p>\n<p class=\"read-more\"> <a class=\"\" href=\"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/\"> <span class=\"screen-reader-text\">CDA to resume construction of Signal Free Controlled Access Corridor<\/span>  <\/a><\/p>\n","protected":false},"author":20,"featured_media":18403,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","footnotes":""},"categories":[22,46],"tags":[],"class_list":["post-18396","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-everyday-news","category-graana-news","is_not_urdu"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v21.4 (Yoast SEO v25.2) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>CDA to resume construction of Signal Free Controlled Access Corridor | Graana.com<\/title>\n<meta name=\"description\" content=\"After announcing to resume the construction work on the Signal Free Controlled Access Corridor soon, CDA has invited bids for the development of the Korang Bridge.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CDA to resume construction of Signal Free Controlled Access Corridor\" \/>\n<meta property=\"og:description\" content=\"After announcing to resume the construction work on the Signal Free Controlled Access Corridor soon, CDA has invited bids for the development of the Korang Bridge.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/\" \/>\n<meta property=\"og:site_name\" content=\"Graana.com\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/GraanaCom\/\" \/>\n<meta property=\"article:published_time\" content=\"2020-05-03T15:20:25+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-07-06T07:19:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.graana.com\/blog\/wp-content\/uploads\/2020\/05\/Motorway1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"960\" \/>\n\t<meta property=\"og:image:height\" content=\"502\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Maham Tahir\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"CDA to resume construction of Signal Free Controlled Access Corridor\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Maham Tahir\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/\"},\"author\":{\"name\":\"Maham Tahir\",\"@id\":\"https:\/\/www.graana.com\/blog\/#\/schema\/person\/3fa4e943f425ded187cef3f4db25d349\"},\"headline\":\"CDA to resume construction of Signal Free Controlled Access Corridor\",\"datePublished\":\"2020-05-03T15:20:25+00:00\",\"dateModified\":\"2022-07-06T07:19:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/\"},\"wordCount\":169,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.graana.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/wpasset.graana.com\/blog\/wp-content\/uploads\/2020\/05\/Motorway1.jpg\",\"articleSection\":[\"Everyday News\",\"Graana News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/#respond\"]}],\"copyrightYear\":\"2020\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.graana.com\/blog\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/\",\"url\":\"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/\",\"name\":\"CDA to resume construction of Signal Free Controlled Access Corridor | Graana.com\",\"isPartOf\":{\"@id\":\"https:\/\/www.graana.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/wpasset.graana.com\/blog\/wp-content\/uploads\/2020\/05\/Motorway1.jpg\",\"datePublished\":\"2020-05-03T15:20:25+00:00\",\"dateModified\":\"2022-07-06T07:19:27+00:00\",\"description\":\"After announcing to resume the construction work on the Signal Free Controlled Access Corridor soon, CDA has invited bids for the development of the Korang Bridge.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/#primaryimage\",\"url\":\"https:\/\/wpasset.graana.com\/blog\/wp-content\/uploads\/2020\/05\/Motorway1.jpg\",\"contentUrl\":\"https:\/\/wpasset.graana.com\/blog\/wp-content\/uploads\/2020\/05\/Motorway1.jpg\",\"width\":960,\"height\":502},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.graana.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Everyday News\",\"item\":\"https:\/\/www.graana.com\/blog\/everyday-news\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"CDA to resume construction of Signal Free Controlled Access Corridor\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.graana.com\/blog\/#website\",\"url\":\"https:\/\/www.graana.com\/blog\/\",\"name\":\"Graana.com\",\"description\":\"Pakistan&#039;s 1st Online Real Estate Marketplace\",\"publisher\":{\"@id\":\"https:\/\/www.graana.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.graana.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.graana.com\/blog\/#organization\",\"name\":\"Graana.com\",\"url\":\"https:\/\/www.graana.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.graana.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/wpassets.graana.com\/blog\/wp-content\/uploads\/2022\/03\/logo.svg\",\"contentUrl\":\"https:\/\/wpassets.graana.com\/blog\/wp-content\/uploads\/2022\/03\/logo.svg\",\"width\":1,\"height\":1,\"caption\":\"Graana.com\"},\"image\":{\"@id\":\"https:\/\/www.graana.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/GraanaCom\/\",\"https:\/\/www.pinterest.com\/graanacom\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.graana.com\/blog\/#\/schema\/person\/3fa4e943f425ded187cef3f4db25d349\",\"name\":\"Maham Tahir\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.graana.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b6845e63cb4018c261a46d3e7381612fafcece9e05b59df62f59f522890c8568?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b6845e63cb4018c261a46d3e7381612fafcece9e05b59df62f59f522890c8568?s=96&d=mm&r=g\",\"caption\":\"Maham Tahir\"},\"url\":\"https:\/\/www.graana.com\/blog\/author\/newsdesk\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"CDA to resume construction of Signal Free Controlled Access Corridor | Graana.com","description":"After announcing to resume the construction work on the Signal Free Controlled Access Corridor soon, CDA has invited bids for the development of the Korang Bridge.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/","og_locale":"en_US","og_type":"article","og_title":"CDA to resume construction of Signal Free Controlled Access Corridor","og_description":"After announcing to resume the construction work on the Signal Free Controlled Access Corridor soon, CDA has invited bids for the development of the Korang Bridge.","og_url":"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/","og_site_name":"Graana.com","article_publisher":"https:\/\/www.facebook.com\/GraanaCom\/","article_published_time":"2020-05-03T15:20:25+00:00","article_modified_time":"2022-07-06T07:19:27+00:00","og_image":[{"width":960,"height":502,"url":"https:\/\/www.graana.com\/blog\/wp-content\/uploads\/2020\/05\/Motorway1.jpg","type":"image\/jpeg"}],"author":"Maham Tahir","twitter_card":"summary_large_image","twitter_title":"CDA to resume construction of Signal Free Controlled Access Corridor","twitter_misc":{"Written by":"Maham Tahir","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/#article","isPartOf":{"@id":"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/"},"author":{"name":"Maham Tahir","@id":"https:\/\/www.graana.com\/blog\/#\/schema\/person\/3fa4e943f425ded187cef3f4db25d349"},"headline":"CDA to resume construction of Signal Free Controlled Access Corridor","datePublished":"2020-05-03T15:20:25+00:00","dateModified":"2022-07-06T07:19:27+00:00","mainEntityOfPage":{"@id":"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/"},"wordCount":169,"commentCount":0,"publisher":{"@id":"https:\/\/www.graana.com\/blog\/#organization"},"image":{"@id":"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/#primaryimage"},"thumbnailUrl":"https:\/\/wpasset.graana.com\/blog\/wp-content\/uploads\/2020\/05\/Motorway1.jpg","articleSection":["Everyday News","Graana News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/#respond"]}],"copyrightYear":"2020","copyrightHolder":{"@id":"https:\/\/www.graana.com\/blog\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/","url":"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/","name":"CDA to resume construction of Signal Free Controlled Access Corridor | Graana.com","isPartOf":{"@id":"https:\/\/www.graana.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/#primaryimage"},"image":{"@id":"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/#primaryimage"},"thumbnailUrl":"https:\/\/wpasset.graana.com\/blog\/wp-content\/uploads\/2020\/05\/Motorway1.jpg","datePublished":"2020-05-03T15:20:25+00:00","dateModified":"2022-07-06T07:19:27+00:00","description":"After announcing to resume the construction work on the Signal Free Controlled Access Corridor soon, CDA has invited bids for the development of the Korang Bridge.","breadcrumb":{"@id":"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/#primaryimage","url":"https:\/\/wpasset.graana.com\/blog\/wp-content\/uploads\/2020\/05\/Motorway1.jpg","contentUrl":"https:\/\/wpasset.graana.com\/blog\/wp-content\/uploads\/2020\/05\/Motorway1.jpg","width":960,"height":502},{"@type":"BreadcrumbList","@id":"https:\/\/www.graana.com\/blog\/cda-to-resume-construction-of-signal-free-controlled-access-corridor\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.graana.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Everyday News","item":"https:\/\/www.graana.com\/blog\/everyday-news\/"},{"@type":"ListItem","position":3,"name":"CDA to resume construction of Signal Free Controlled Access Corridor"}]},{"@type":"WebSite","@id":"https:\/\/www.graana.com\/blog\/#website","url":"https:\/\/www.graana.com\/blog\/","name":"Graana.com","description":"Pakistan&#039;s 1st Online Real Estate Marketplace","publisher":{"@id":"https:\/\/www.graana.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.graana.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.graana.com\/blog\/#organization","name":"Graana.com","url":"https:\/\/www.graana.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.graana.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/wpassets.graana.com\/blog\/wp-content\/uploads\/2022\/03\/logo.svg","contentUrl":"https:\/\/wpassets.graana.com\/blog\/wp-content\/uploads\/2022\/03\/logo.svg","width":1,"height":1,"caption":"Graana.com"},"image":{"@id":"https:\/\/www.graana.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/GraanaCom\/","https:\/\/www.pinterest.com\/graanacom"]},{"@type":"Person","@id":"https:\/\/www.graana.com\/blog\/#\/schema\/person\/3fa4e943f425ded187cef3f4db25d349","name":"Maham Tahir","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.graana.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b6845e63cb4018c261a46d3e7381612fafcece9e05b59df62f59f522890c8568?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b6845e63cb4018c261a46d3e7381612fafcece9e05b59df62f59f522890c8568?s=96&d=mm&r=g","caption":"Maham Tahir"},"url":"https:\/\/www.graana.com\/blog\/author\/newsdesk\/"}]}},"is_urdu":false,"_links":{"self":[{"href":"https:\/\/www.graana.com\/blog\/wp-json\/wp\/v2\/posts\/18396","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.graana.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.graana.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.graana.com\/blog\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/www.graana.com\/blog\/wp-json\/wp\/v2\/comments?post=18396"}],"version-history":[{"count":0,"href":"https:\/\/www.graana.com\/blog\/wp-json\/wp\/v2\/posts\/18396\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.graana.com\/blog\/wp-json\/wp\/v2\/media\/18403"}],"wp:attachment":[{"href":"https:\/\/www.graana.com\/blog\/wp-json\/wp\/v2\/media?parent=18396"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.graana.com\/blog\/wp-json\/wp\/v2\/categories?post=18396"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.graana.com\/blog\/wp-json\/wp\/v2\/tags?post=18396"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}