CDA, FWO speed up work on low-cost housing projects in Islamabad

ISLAMABAD: The Capital Development Authority (CDA) and Frontier Works Organisation (FWO) have accelerated work on Naya Pakistan Housing Development Authority’s (NAPHDA) low-cost housing scheme in the federal capital.

invest with imarat

Islamabad’s emerging city centre

Learn More

A total of 2,400 flats are being built under this project, out of which a total of 400 units have been allotted for the residents of the Katchi Abadis nearby.

While briefing on the progress of the work, it was reported that excavation work had been completed on 26 blocks. A steel cage for columns has been developed for 16 blocks, and the raft has been prepared in two blocks. While 21 blocks of lean have been completed. Furthermore, earthwork for the road is underway. 

For the project’s early completion, a complete logistic strategy has been established. It was also revealed that a 1000-strong staff is now deployed, with the number expected to rise to 3000 to 4000 shortly, which will aid in the timely completion of the project and provide job opportunities.

Inside the project, an on-site laboratory has been developed to assess the quality of building materials, which would aid to test the materials used in construction and save time.

For news and blogs, visit Graana.com. 

Maham Tahir

Recent Posts

LCCI establishes Rs3m Emergency Fund for KPK flood-hit people

LAHORE – The Lahore Chamber of Commerce and Industry (LCCI) on Sunday announced an emergency…

2 days ago

Saudi Banks’ Lending Surges to SR3.2 Trillion in June, Propelled by Corporate Demand

RIYADH – Outstanding loans from Saudi banks climbed to SR3.2 trillion ($849.7 billion) in June,…

2 days ago

CDA Sets 3-Month Deadline for Rs1.4B T-Chowk Flyover

ISLAMABAD: The Capital Development Authority (CDA) has opened bids for the Rs1.4 billion T-Chowk Flyover,…

3 days ago

Future Salalah City Announced: 60,000-Resident Urban Project to Transform Dhofar

SALALAH: Oman’s Ministry of Housing and Urban Planning has announced plans for Future Salalah City,…

4 days ago

Approval Granted for Gwadar’s Eastbay Expressway Phase II

Gwadar: The federal government has approved the construction of Gwadar Eastbay Expressway Phase II, linking…

6 days ago

Government Abolishes Right of Way Fees on Federal Property

The federal government has announced the abolition of Right of Way (RoW) charges on federal…

1 week ago